Skip to main content
CERN
Accelerating science
Sign in
Directory
Main navigation
Toggle navigation
BE
About OP
Home
Organigram
OP Shutdown Lectures
OP Webtools
2023 Weekly Machine Report
Weekly Machine Reports (archive)
Sections
AD & ELENA Operation (AD)
ISOLDE Operation (ISO)
LINAC4 & PSB Operation (PSB)
PS Operation & AD/ELENA Backup Operation (PS)
SPS & LEIR Operation (SPS)
LHC Operation (LHC)
Technical Infrastructure Operation (TI)
Accelerator Schedules
Injector Schedule
LHC schedule
Long-term Schedule for the Accelerator Complex
Links
SEARCH
Enter the terms you wish to search for.
Sections
AD & ELENA Operation (AD)
Responsible for the operation of the Antiproton Decelerator (AD).
AD & ELENA Operation (AD)
Responsible for the operation of the Antiproton Decelerator (AD).
ISOLDE Operation (ISO)
Responsible for the operation of the on-line production of short-lived radioactive isotopes in CERN's ISOLDE machine.
ISOLDE Operation (ISO)
Responsible for the operation of the on-line production of short-lived radioactive isotopes in CERN's ISOLDE machine.
LHC Beam Operation
Responsible for the operation of the Large Hadron Collider (LHC).
LHC Beam Operation
Responsible for the operation of the Large Hadron Collider (LHC).
LINAC4 & PSB Operation (PSB)
Responsible for the operation of the PS Booster.
LINAC4 & PSB Operation (PSB)
Responsible for the operation of the PS Booster.
PS Operation & AD/ELENA Backup Operation (PS)
Responsible for the operation of PS, the beam lines to the experimental zones in the East Area and the nTOF facility.
PS Operation & AD/ELENA Backup Operation (P...
Responsible for the operation of PS, the beam lines to the experimental zones in the East Area and the nTOF facility.
SPS & LEIR Operation (SPS)
Responsible for the operation of Super Proton Synchrotron (SPS), including the North Area and LEIR.
SPS & LEIR Operation (SPS)
Responsible for the operation of Super Proton Synchrotron (SPS), including the North Area and LEIR.
Technical Infrastructure Operation (TI)
Monitoring CERN's Technical Infrastructure 24 hours a day, 365 days a year.
Technical Infrastructure Operation (TI)
Monitoring CERN's Technical Infrastructure 24 hours a day, 365 days a year.